• Objective: Enhance journey times and alleviate traffic congestion during the festive period by identifying bottlenecks along key routes and facilitating smoother commuter movement .
• Scope of Work: Includes reclamation of collapsed embankment, construction of retaining walls, provision of lean asphalt on shoulders, cutting to shape of potholes, scarification of failed sections, and provision of asphalt wearing course in potholes and failed sections .
• Targets:
– Patch 18,850 square meters of road surface
– Rehabilitate over 12,000 failed sections
– Complete 2,700 square meters of road overlay
– Make 653 kilometers of road motorable .
• Expected Benefits:
– Improved road safety
– Reduced travel times
– Generation of over 12,000 jobs, contributing to economic growth .
• Implementation: FERMA has strategically mapped out traffic-prone areas, prioritizing them for maintenance to ensure maximum positive impact on road users .
The Federal Government, through FERMA, has launched “Operation Connect to Your Destination” Phase 2, a major road repair initiative aimed at improving traffic flow across federal highways nationwide ahead of the festive season. This project targets to patch 18,850 square meters of road surface, rehabilitate over 12,000 failed sections, complete 2,700 square meters of road overlay, and make 653 kilometers of road motorable .
According to FERMA Managing Director, Engr. Chukwuemeka Agbasi, the project aims to enhance journey times and alleviate traffic congestion during the festive period, recognizing that traffic flows increase significantly between the north and south during this time. The agency has strategically mapped out traffic-prone areas, prioritizing them for maintenance to ensure maximum positive impact on road users .
Key Objectives:
- Patch 18,850 square meters of road surface
- Rehabilitate over 12,000 failed sections
- Complete 2,700 square meters of road overlay
- Make 653 kilometers of road motorable
Expected Benefits:
- Enhanced journey times
- Reduced traffic congestion
- Improved road safety
- Generation of over 12,000 jobs, contributing to economic growth
The project is scheduled for completion by mid-December to avoid interruptions during the yuletide period ¹. This initiative has been welcomed by Kano State’s Federal Road Safety Corps (FRSC) Sector Commander, Umar Matazu, who urged drivers to exercise caution and drive responsibly once the maintenance is complete .